Project
New-construction community
Technical crew case study
OGC was brought on as the skilled, manufacturer-backed commercial roofing crew for concrete tile field work and flat-roof details on a Fort Myers new-construction community.

Project facts
New-construction community
Fort Myers, Florida
Skilled, manufacturer-backed commercial roofing crew
New-construction concrete tile
Polyglass modified-bitumen assembly at fire-wall and penetration areas
Tile field installation plus flat-roof detail work
Challenge
The new-construction community combined a concrete tile field with low-slope details at fire walls and penetrations. Those transitions needed the same attention as the broad roof field because small coordination misses can become larger closeout problems.

Approach
OGC coordinated the concrete tile installation with Polyglass modified-bitumen work at the flat detail areas. The crew was brought on for technical execution and worked within the construction schedule without naming or speaking for the contractor of record.

Solution
The assigned scope combined the new tile field with modified-bitumen detailing at the fire-wall and penetration areas. Project-specific photos show the installation, the Polyglass detail work, and the finished tile surface.
Result
The project demonstrates OGC's ability to execute tile and low-slope detail conditions on the same new-construction community.