Dual-licensedFlorida Roofing CCC1332364 · General Contractor CGC1504639
5.0 ★ · 38 Google Reviewsview the Google Business Profile
Over 600commercial roofing projects across Florida
Southwest Florida basedstatewide reach · 786-696-4829
Manufacturer-certified / approved applicatorDuro-Last · Carlisle · Versico · GAF · Mule-Hide · RhinoBond · R.M. Lucas · ALDO · Firestone · Tremco · Sika
What OGC does HOA & condo-community tile reroofs · Gulf-coast condominium towers · commercial TPO · metal-roof restoration coatings · new construction · occupied-building reroofsSectors roofed Florida schools · Orlando hospitality · auto dealerships · industrial / steel plants · retailTested tile systems Trieste II: 19 of 19 PE-certified uplift tests passed

HOA / condominium case study

Sandpiper at Bonita BayCompleted Concrete Tile Re-Roof, Bonita Springs

A completed concrete barrel-tile re-roof for an occupied, multi-building community in Bonita Bay, planned around residents, access, and daily site control.

CompletedConcrete barrel tileBonita Springs
Aerial of the concrete tile re-roof at Sandpiper at Bonita Bay beside lagoons and golf-course landscaping in Bonita Springs
Drone view of the occupied Bonita Bay community and active tile re-roof.

Project facts

Scope at a glance

Property

Occupied HOA and condominium community in Bonita Bay

Location

Bonita Springs, Florida

Scope

Full concrete barrel-tile re-roof

Operating condition

Residents and community access remained active

Delivery

Phased tear-off, dry-in, tile installation, and daily site care

Status

Completed

Challenge

Occupied community, active access

Sandpiper at Bonita Bay needed a full concrete barrel-tile re-roof while residents continued using the community. Roof access, material movement, protection, and daily cleanup had to be treated as part of the roofing scope—not afterthoughts.

Concrete tile tear-off and dry-in work at Sandpiper at Bonita Bay in Bonita Springs
Tile removal and dry-in work at the occupied Bonita Springs community.

Approach

Phase the work around the property

OGC sequenced tear-off and dry-in so each active roof area moved through a controlled progression. The crew protected access routes and documented exposed-deck conditions before the new tile work advanced.

Bare roof deck after concrete tile tear-off at Sandpiper at Bonita Bay
Exposed roof deck documented during the full tear-off.

Solution

Concrete tile installed with visible site control

The project moved from full tile removal through dry-in and new concrete barrel-tile installation. Real project photography shows the roof deck, the work in progress, and the finished tile field.

Finished concrete barrel-tile roof at Sandpiper at Bonita Bay in Bonita Springs
Finished concrete tile field from the completed community re-roof.

Result

A completed community re-roof

The community received its completed concrete tile re-roof, documented with aerial, tear-off, deck, and finished-roof photography from the project.

Property-specific next step

Request a Commercial Roof Assessment

Tell us about the property and the decision in front of you. OGC will review the details, confirm current availability, and outline the appropriate next step.

Call 786-696-4829 →

Your details are used to respond to your request and are not sent to Google Analytics. See our Privacy Policy.